Estimating pump-down time: volume, speed and conductance
How to estimate the time a vacuum pump needs to reach a target pressure, why the textbook formula is optimistic, and what to check first.
A pump-down estimate is the first number an engineer asks for and the easiest one to get wrong. The textbook formula is useful as a lower bound, not as a promise.
The ideal formula
For a chamber of volume V pumped at a constant effective speed S, with negligible leakage and outgassing:
t = (V / S) × ln(p0 / p)
where p0 is the starting pressure and p the target. The natural logarithm matters: every factor-of-ten pressure drop costs the same additional time, which is why the last decade of pressure is where estimates fail.
A worked example, stated as an estimate rather than a specification:
V = 50 L = 0.05 m3
S = 10 m3/h = 0.00278 m3/s
p0 = 1000 mbar (atmosphere)
p = 1 mbar
t = (0.05 / 0.00278) × ln(1000) ≈ 18 × 6.91 ≈ 124 s ≈ 2.1 min
Under ideal conditions this chamber reaches 1 mbar in about two minutes. In practice it will take longer, sometimes several times longer.
Why the real number is higher
| Effect | What it does | What to do |
|---|---|---|
| Line conductance | A long or narrow line reduces the speed that actually reaches the chamber | Shorten the line, increase the DN, avoid extra elbows |
| Outgassing | Water on chamber walls dominates below roughly 1 Pa | Bake-out, clean surfaces, dry purge |
| Real leaks | Sets a floor pressure the pump cannot pass below | Leak-check with a blank flange before blaming the pump |
| Speed curve | Pumping speed is not constant across the pressure range | Use the manufacturer's speed curve, not the catalogue maximum |
| Vapour load | Condensable vapour behaves differently from air | Gas ballast on oil pumps, vapour tolerance on dry pumps |
Leak rate and ultimate pressure are different quantities. A leak rate in mbar·L/s and an ultimate pressure in Pa or Torr cannot be compared directly. An elastomer-sealed KF system is commonly quoted around 1 × 10⁻⁹ mbar·L/s; a metal-gasket CF system reaches a much lower pressure range. Quoting one as if it were the other leads to a pump that passes the leak test and still misses the target pressure.
Conductance, briefly
The effective speed at the chamber is not the speed at the pump inlet. Combining the pump speed S and the line conductance C:
1 / S_eff = 1 / S + 1 / C
A short, wide KF40 line at high vacuum can have a conductance comparable to the pump speed; a long KF16 line with two elbows may be an order of magnitude lower. This is the single most common reason a correctly sized pump appears to underperform. Adding a second elbow is not a neutral choice.
A practical sizing sequence
- Fix the chamber volume, target pressure and acceptable time.
- Compute the ideal
tas a lower bound. - Multiply by a margin that reflects the surface condition — clean metal with a short line needs less than a large chamber with many elastomer seals.
- Check the pump's speed curve at the target pressure, not its peak value.
- Compare line conductance with the pump speed. If
Cis not clearly larger thanS, increase the DN before increasing the pump. - If the target is below 1 Pa, plan bake-out and a leak check as part of the procedure.
- For a Roots booster, size the backing pump first; the booster only raises speed in its working pressure band.
What we need to quote properly
To turn an estimate into a pump recommendation, send the chamber volume, target working pressure, target time, gas composition (especially water or solvent vapour), and the length and DN of the existing line. We will confirm the model and the matching fittings against the factory datasheet before quoting. We do not publish nominal performance figures that we have not verified.